The Comprehensive Plan is broken into 3 categories Source of Supply, Transmission and Distribution, and General and Administrative.
Source of Supply relates to water treatment. Montezuma Water Company has a relatively new plant (1998) with the capacity of 4 mgd.
The water source is McPhee Reservoir that is fed by the Dolores River. MWC has 14 cfs of water rights with 10 cfs stored in Ground Hog Reservoir. MWC also has 3 wells that are used for backup or emergency that are located in Lost Canyon. The WTP located on County Rd T uses the ACTIFLO process for coagulation and sedimentation, multi-media filtration, pre-disinfectant is chlorine dioxide, and post-disinfectant is chlorine gas.
MWC currently serves approximately 3750 members in three counties in Southwest Colorado. MWC has approximately 1,833,327 feet of mainlines ranging from 1.25 to 12.
Enclosed is a copy of the plan for Source of Supply, Transmission and Distribution, and General and Administrative.
SOURCE AND SUPPLY
2003
►
SCADA-SYSTEM CONTROL AND DATA
ACQUISITION - Project #1-B-0-03
SCADA project. Installation of RTU
at Tank #5, and two metering sites.
►
HIGH SERVICE PUMP UPGRADE
Project # 1-A-6-03
Add
additional High Service pumping capacity add VFD Pump 400-gpm Includes
new 700-gpm constant speed pump.
►
BACKWASH POND RETURN-
Project # 1-D-6-03
Installation of equipment to control and monitor
backwash water- Installation of VFD pump to
work with plant flow.
►
CHLORINE DIOXIDE MONITOR
Project # 1-G-6-03
Alarm system to alert operators of any changes in
the operation of chlorine dioxide system.
►
MISCELLANEOUS-
Includes
plant tools, lab equipment and supplies and miscellaneous equipment
2004
►
FILTER #1 REHABILITATION-
Project # 1-F-6-04
Sandblast, paint and replace media in Filter #1, add air scourer to
improve backwash process
►
SCADA-SYSTEM CONTROL AND
DATA ACQUISITION - Project #
1-S-0-04
SCADA
project. Installation of RTUs at Tank #3, and two metering sites.
►
DRYING
POND REHABILITATION/UPGRADE Project
# 1-A-6-04
Construct larger capacity pond to the south of the
existing drying pond. This pond will be utilized mainly during the time period
that existing ponds are cleaned.
►
MISCELLANEOUS-
Includes plant tools, lab equipment and supplies and
miscellaneous equipment.
2005
►
SCADA-SYSTEM CONTROL AND DATA ACQUISITION - Project # 1-S-0-05
SCADA
project. Installation of RTU at Tank #6, and two metering sites installed.
►
FILTER #2 REHABILITATION Project # 1-F-6-05
Sandblast, paint and replace media in Filter #2, add air scourer to
improve backwash process.
►
REHABILITATION
OF TANK #6 Project # 1-T-4-05
Tank # 6 was taken out of
service in 2002 and inspected. The tank will be sandblasted on the interior and
pressure washed on the exterior, both will be painted and cathodic protection
installed.
►
MISCELLANEOUS-
Includes plant tools, lab equipment and supplies and
miscellaneous equipment.
2006
►
SCADA-SYSTEM CONTROL AND DATA ACQUISITION - Project # 1-S-0-06
SCADA project. Installation of RTUs at Tank #2 and two metering sites.
►
RELOCATION
OF TANK #4
Project # 1-A-9-06
Move Tank #4 to Dove
Creek Project Rd 14 just north of Rd M. This will utilize the 100,000-gallon
capacity and allow storage for pump station.
►
REHABILITATION
OF RAW WATER PUMP #1
Project # 1-B-6-06
The
raw water pumps have had no maintenance since installation in 1985. A new VFD
was installed during the plant upgrade in 1998.
►
MISCELLANEOUS-
Includes
plant tools, lab equipment and supplies and miscellaneous equipment.
2007
►
SCADA-SYSTEM CONTROL AND DATA ACQUISITION - Project # 1-S-0-07
SCADA project. Installation of RTUs at Tank #8 and 2 metering sites each
to monitor flow, usage etc.
►
REHABILITATION
OF TANK #7 Project # 1-A-1-07
Tank #7 cleaned and
painted exterior in 2002. The tank will be sandblasted on the interior, painted
and cathodic protection installed.
►
RELOCATION
OF PUMP STATION YELLOW JACKET & DOVE CREEK
Project # 1-B-9-07
The old Dove Creek pump station was moved to Yellow Jacket in 2000 due to capacity of the station. A new pump station with larger capacity was installed at the Dove Creek site to meet demand. The Yellow Jacket pump station (old DC pump) would once again be relocated at the DC site and the existing DC pump station would be relocated to Tank #4 site on Rd M & Rd 15. Yellow Jacket pump station would be in place for a back up to the DC system only.
►
MISCELLANEOUS-
Includes
plant tools, lab equipment and supplies and miscellaneous equipment.
2008
►
SCADA-SYSTEM
CONTROL AND DATA ACQUISITION --
Project # 1-S-0-08
SCADA
project. Installation of RTUs at Tank #9 and 2 metering sites.
►
REHABILITATION
OF RAW WATER PUMP #2 Project # 1-R-6-08
The raw water pumps have had no maintenance since installation in 1985. A new VFD was installed during the plant upgrade in 1998, #1 PUMP 2006.
►
MISCELLANEOUS-
Includes plant tools, lab equipment and supplies and miscellaneous
equipment.
2009
►
SCADA-SYSTEM
CONTROL AND DATA ACQUISITION --
Project # 1-S-0-09
SCADA project. Installation of RTUs at 3 metering sites.
►
REHABILITATION
OF TANK #5 Project # 1-T-5-09
Inspect,
pressure clean the exterior, sandblast the interior, paint both and install
cathodic protection.
►
REHABILITATION
OF BACKWASH PUMPS Project # 1-G-6-09
These
pumps do not see a lot of use, we would take one at a time off line and inspect,
then perform necessary maintenance.
2010
►
SCADA-SYSTEM
CONTROL AND DATA ACQUISITION --
Project # 1-S-0-10
SCADA
project. Installation of RTUs at 3
metering sites.
►
FILTER #3 REHABILIATION Project # 1-F-6-10
Paint and replace media in Filter #3-Preventative
maintenance.
►
TANK
#8 INSPECTION-CATHODIC PROTECTION
Project # 1-B-9-10
Inspect
tank, clean and install cathodic protection.
► REHABILITATION OF RAW WATER PUMP #3 Project # 1-H-6-10
The raw water pumps have had no maintenance since installation in 1985. A new VFD was installed during the plant upgrade in 1998.
2011
►
SCADA-SYSTEM
CONTROL AND DATA ACQUISITION --
Project # 1-S-0-11
SCADA project. Installation of
RTUs at 3 metering sites completion of SCADA Project.
►
FILTER #4 REHABILITATION Project # 1-F-6-11
Paint and replace
media in Filter #4-Preventative maintenance.
2012
►
ENGINEERING
WATER TREATMENT PLANT UPGRADE STUDY Project # 1-E-6-12
The
WTP was upgraded in 1998 to 4-mgd plant. Study plant upgrade for more capacity.
►
TANK
#9 INSPECTION-CATHODIC PROTECTION
Project # 1-T-9-12
Inspect tank,
clean and install cathodic protection.
2013
►
TANK
#11 INSPECTION
Project # 1-A-6-13
Inspect and clean, repairs.
TRANSMISSION AND
DISTRIBUTION
2003
►
DOVE CREEK FEED #6- 12 RD 18/CC
TO RD 16/DD
Continuation of project to remove stress of line on Highway 666 and
getting MWC water to DC area. $17.42 per foot- Estimated 15,000 feet
►
CEDAR MESA FEED #4-RD P (RD 32.4) TO RD M & RD 34-
A
continuation of the 8 line to feed the Cedar Mesa Tank. Estimated 15,000 feet
- $10.75 per foot
► CORTEZ FEED/ERTEL
A casing pipe has been installed under Rd M prior to Montezuma County
Road Department doing their work on RD M. The 6 line at the LDS Chapel is
more beneficial for MWC if it ties to the 6 line that was installed in 2001
near Keenan Ertels on Rd 26. Approximately 5000 Feet- $6.84 per foot.
►
LEAVELL
DRAW-HWY 184/Rd 23.5 SOUTH
This was discussed last year and we are looking at easement rather than
following the county road due to narrow ROW. This will open up the red-lined
area due to small line sizes in the area.
►
HIGHLINE
FEED-LAVERDE ESTATES TO RD H
This is a fix for the red line area
on Rd H east of Rd 27. This area has a 3 inch line feeding a 2
line- 14 taps will be removed from the current feed and velocities will
be reduced.
2004
►
DOVE CREEK FEED #7- 12 - RD
16/DD NORTH TO RD S
Continuation of
project to remove stress of line on Highway 666 and getting MWC water to
DC area. $17.42 per foot- Estimated 15,000 feet.
►
CEDAR MESA FEED #5- RD 34 SOUTH TO
SRWD METER
A
continuation of the 8 line to feed the Cedar Mesa Tank. Estimated 15,000 feet
- $10.75 per foot.
►
ARRIOLA
FEED- RD 24 TO RD 23- NORTH ON RD 23
Extended
the 6 mainline along Rd S- replace old 2 main- Rd 23 North and cross canal
and tie to existing 2.
► SPRING CANYON FEED
Extend
4 main from Hattaway extension south and loop line back to 4 that feeds
Spring Canyon that is currently fed with 2.
2005
►
CEDAR MESA FEED #6- RD 34 SRWD METER TO HIGHWAY 160
A continuation of the 8 line to
feed the Cedar Mesa Tank. Estimated 15,000
feet - $10.75 per foot.
►
DOVE CREEK FEED #8- 12 - RD 16
TO RD R- WEST TO RD 14
Tie
in DC Feed Project to existing DC Phase II Project - Estimated 15,000 feet
►
HILLTOP
EXTENSION 12
Extend
12 mainline from McClellans Hilltop Subdivision thru Oscar Hamilton
property to USFS/Williams Pipeline easement.
►
RD L RD 24 TO RD 23
Loop the
line on Rd L .
2006
►
160
EAST FEED- RD 34 TO STATE PARK
Install
new 6 mainline along Hwy 160 to eliminate the use of MRWC carriage on their
3 mainline.
►
RD
L- LOOP RD 22 TO RD L
This
line has never been looped due to the rock creating two dead end lines, this
project will eliminate the dead end lines.
►
RD 28 LINE EXTENSION
The Goode/Watkins development will bring water south from Hwy 184 to
their development and MWC will continue the line south and tie to Rd 28. This
extension will eliminate the low pressure that now exists on Rd 28.
►
HWY 145- RD R SOUTH TO
RD P
Extend
the 12 gravity line down Hwy 145 from Rd R to Rd P. This project will take
more gravity water to high-density area around the city of Cortez.
2007
►
HILLTOP
EXTENSION- McCLELLAN THRU OSCAR HAMILTONS
The
continuation of the 12 that replaces the 8 line that feeds north to DC.
►
RD
P / HWY 145 TO RD 26
Extend the 12 gravity line west on
Rd P to Rd 26. This project will take more gravity water to the high-density
area around the city of Cortez.
►
POPLIN
/ RD 22 TO RD W
The
3 mainline was extended by Mike Poplin in 2003 MWC will complete the 3
line down Rd 22 and tie to the existing line on W to create a loop and remove
the dead end lines.
2008
►
HWY
184 BACK TO RD 27
Install
new 12 line that ties to the 12 at Hilltop and install along Hwy 184 that
will assist the existing 8. This line feeds the system north.
►
RD 26/RD P SOUTH TO RD
N
Extend the 12 gravity line south on Rd 26 to Rd N. This project will take more gravity water to the high-density area around the city of Cortez.
►
HWY
160 BETHAL CHURCH TO FAIRGROUNDS
Install new line from the existing line on Hwy 160 to
the Montezuma
County Fairgrounds. This completes the loop started from Hwy 184 that allows MWC
to route water in an additional supply for the south valley if needed.
2009
►
RD
2O NORTH OF HWY 666
Replace the existing 1-1/4 mainline along Rd 20.
►
HWY
184-REPLACE MORTAR STEEL LINE
Install new 12 line to replace the old 8 steel mortar line pipe
along Hwy 184.
►
RD
23-SOUTH OF RD X
Replace the 1-1/4 mainline along Rd 23 south with new 4 mainline.
2010
►
HWY
666- HWY 184 TO RD W
Replace the 6 steel mortar line along Hwy 666 to Rd 21 north to Rd W.
► RD N- RD 22 TO RD 21
Install 4 mainline from existing 4 on Rd N west to Rd 21- loops
system.
►
RD 22- SOUTH FROM
RD P TO RD N
Install new 4 mainline along Rd 22 from Rd P to Rd N to replace
existing 1-1/4 and loop the system.
GENERAL AND ADMINISTRATIVE
2007
►
OFFICE REMODEL
Remodel office completely by removing the garage door and add Board / Meeting room, add two (2) additional offices. Add a bathroom, add air conditioning to entire building as well as upgrading/ expanding heating system. Install drive-up window and change interior front desk area. Construct large fireproof vault that will protect past years documents. Add employee parking area in rear of building.