The Comprehensive Plan is broken into 3 categories Source of Supply, Transmission and Distribution, and General and Administrative.
Source of Supply relates to water treatment. Montezuma Water Company has a relatively new plant (1998) with the capacity of 4 mgd.
The water source is McPhee Reservoir that is fed by the Dolores River. MWC has 14 cfs of water rights with 10 cfs stored in Ground Hog Reservoir. MWC also has 3 wells that are used for backup or emergency that are located in Lost Canyon. The WTP located on County Rd T uses the ACTIFLO process for coagulation and sedimentation, multi-media filtration, pre-disinfectant is chlorine dioxide, and post-disinfectant is chlorine gas.
MWC currently serves approximately 4970 members in three counties in Southwest Colorado. MWC has approximately 1,833,327 feet of mainlines ranging from 1.25 to 12.
Enclosed is a copy of the plan for Source of Supply, Transmission and Distribution, and General and Administrative.
SOURCE AND SUPPLY
2010
►
SCADA-SYSTEM
CONTROL AND DATA ACQUISITION --
Project # 1-S-0-10
SCADA
project. Installation of RTUs at 3
metering sites.
►
FILTER #3 REHABILIATION Project # 1-F-6-10
Paint and replace media in Filter #3-Preventative
maintenance.
►
TANK
#8 INSPECTION-CATHODIC PROTECTION
Project # 1-B-9-10
Inspect
tank, clean and install cathodic protection.
► REHABILITATION OF RAW WATER PUMP #3 Project # 1-H-6-10
The raw water pumps have had no maintenance since installation in 1985. A new VFD was installed during the plant upgrade in 1998.
2011
►
SCADA-SYSTEM
CONTROL AND DATA ACQUISITION --
Project # 1-S-0-11
SCADA project. Installation of
RTUs at 3 metering sites completion of SCADA Project.
►
FILTER #4 REHABILITATION Project # 1-F-6-11
Paint and replace
media in Filter #4-Preventative maintenance.
2012
►
ENGINEERING
WATER TREATMENT PLANT UPGRADE STUDY Project # 1-E-6-12
The
WTP was upgraded in 1998 to 4-mgd plant. Study plant upgrade for more capacity.
►
TANK
#9 INSPECTION-CATHODIC PROTECTION
Project # 1-T-9-12
Inspect tank,
clean and install cathodic protection.
2013
►
TANK
#11 INSPECTION
Project # 1-A-6-13
Inspect and clean, repairs.
TRANSMISSION AND
DISTRIBUTION
2004
►
DOVE CREEK FEED #7- 12 - RD
16/DD NORTH TO RD S
Continuation of
project to remove stress of line on Highway 666 and getting MWC water to
DC area. $17.42 per foot- Estimated 15,000 feet.
►
CEDAR MESA FEED #5- RD 34 SOUTH TO
SRWD METER
A
continuation of the 8 line to feed the Cedar Mesa Tank. Estimated 15,000 feet
- $10.75 per foot.
►
ARRIOLA
FEED- RD 24 TO RD 23- NORTH ON RD 23
Extended
the 6 mainline along Rd S- replace old 2 main- Rd 23 North and cross canal
and tie to existing 2.
► SPRING CANYON FEED
Extend
4 main from Hattaway extension south and loop line back to 4 that feeds
Spring Canyon that is currently fed with 2.
2005
►
CEDAR MESA FEED #6- RD 34 SRWD METER TO HIGHWAY 160
A continuation of the 8 line to
feed the Cedar Mesa Tank. Estimated 15,000
feet - $10.75 per foot.
►
DOVE CREEK FEED #8- 12 - RD 16
TO RD R- WEST TO RD 14
Tie
in DC Feed Project to existing DC Phase II Project - Estimated 15,000 feet
►
HILLTOP
EXTENSION 12
Extend
12 mainline from McClellans Hilltop Subdivision thru Oscar Hamilton
property to USFS/Williams Pipeline easement.
►
RD L RD 24 TO RD 23
Loop the
line on Rd L .
2006
►
160
EAST FEED- RD 34 TO STATE PARK
Install
new 6 mainline along Hwy 160 to eliminate the use of MRWC carriage on their
3 mainline.
►
RD
L- LOOP RD 22 TO RD L
This
line has never been looped due to the rock creating two dead end lines, this
project will eliminate the dead end lines.
►
RD 28 LINE EXTENSION
The Goode/Watkins development will bring water south from Hwy 184 to
their development and MWC will continue the line south and tie to Rd 28. This
extension will eliminate the low pressure that now exists on Rd 28.
►
HWY 145- RD R SOUTH TO
RD P
Extend
the 12 gravity line down Hwy 145 from Rd R to Rd P. This project will take
more gravity water to high-density area around the city of Cortez.
2007
►
HILLTOP
EXTENSION- McCLELLAN THRU OSCAR HAMILTONS
The
continuation of the 12 that replaces the 8 line that feeds north to DC.
►
2008
►
HWY
184 BACK TO RD 27
Install
new 12 line that ties to the 12 at Hilltop and install along Hwy 184 that
will assist the existing 8. This line feeds the system north.
►
RD 26/RD P SOUTH TO RD
N
Extend the 12 gravity line south on Rd 26 to Rd N. This project will take more gravity water to the high-density area around the city of Cortez.
►
HWY
160 BETHAL CHURCH TO FAIRGROUNDS
Install new line from the existing line on Hwy 160 to
the Montezuma
County Fairgrounds. This completes the loop started from Hwy 184 that allows MWC
to route water in an additional supply for the south valley if needed.
2009
►
RD
2O NORTH OF HWY 666
Replace the existing 1-1/4 mainline along Rd 20.
►
HWY
184-REPLACE MORTAR STEEL LINE
Install new 12 line to replace the old 8 steel mortar line pipe
along Hwy 184.
►
RD
23-SOUTH OF RD X
Replace the 1-1/4 mainline along Rd 23 south with new 4 mainline.
2010
►
HWY
666- HWY 184 TO RD W
Replace the 6 steel mortar line along Hwy 666 to Rd 21 north to Rd W.
► RD N- RD 22 TO RD 21
Install 4 mainline from existing 4 on Rd N west to Rd 21- loops
system.
►
RD 22- SOUTH FROM
RD P TO RD N
Install new 4 mainline along Rd 22 from Rd P to Rd N to replace
existing 1-1/4 and loop the system.
GENERAL AND ADMINISTRATIVE
2007
►
OFFICE REMODEL
Remodel office completely by removing the garage door and add Board / Meeting room, add two (2) additional offices. Add a bathroom, add air conditioning to entire building as well as upgrading/ expanding heating system. Install drive-up window and change interior front desk area. Construct large fireproof vault that will protect past years documents. Add employee parking area in rear of building.